GR8 Chunnel

The Channel Tunnel was opened to the public on 22/12/1994 (however, the service tunnel was opened four years before).

Did you know?
– The total cost of the Channel Tunnel was 4.65 billion GBP (80% more than planned)

– The mass of limestone, other stones and the soil removed from undergrund was enough to build a hill near Dover called Samphire Hoe (samphire: a European plant which grows on rocks and cliffs by the sea, its leaves are often eaten)

– Eleven 1,300-tonne behomoth tunnel boring machines (TBMs) were used in the making

– Lining is guaranteed for 120 years

– The Eurotunnel is one of the New7Wonders of the World.

For more information visit the Timeline here:
https://www.getlinkgroup.com/uk/the-channel-tunnel/history/

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.